Design and Construction of an Electric Furnace for Rock- and Paleomagnetic InvestigationsJude Kessler (2004) |
||
Specifications:
|
![]() |
|
![]() |
![]() |
![]() |
| testing the very first prototype | Jude keeping a watchful eye on the temperature controller | Model 1: Tmax = 560ºC, 140ºC to go... |
![]() |
![]() |
|
| one of the final heating runs - with upgraded insulation and a second heating wire the furnace reaches 800 C within approximately eight minutes. | The final version of Jude's furnace, the quartz furnace tube is placed inside ceramic insulation and a m-metal shielding. A field coil inside the shielding allows for the application of a controlled magnetic field. | Jude with the final version of his furnace. |