Throughout January, the construction crew used a crane to move the massive girders into place for the steel framework. Now visiters can actually see the structure rising over neighboring buildings well before arriving at the site. In addition, utilities service is complete; water and electrical lines have been brought to the building.
In the coming weeks, workers will finish the steel framework, put a roof overhead, finish plumbing within the building's footprint, and pour the slab for the floor.
(Click here for instructions for downloading these photos.)
 |
|
 |
|
Standing inside the framework, one can see the huge girders that will soon support the structure's roof. |
|
A view looking towards New Britain Avenue on the east side of the building shows where the visitors' locker rooms will one day be. |
 |
|
 |
|
This view, from New Britain Avenue looking south, shows what will soon be the front of the CSC. |
|
View looking north from Broad Street. |
Download instructions:
Larger versions (approx. 6"x10", 300 dpi) of the images above are available for download by the media.
-
Click a desired thumbnail above.
-
A separate window will open displaying a larger version of the photo you selected. Click-and-hold (Windows® users right-click) on the image in this separate window.
-
From the menu that appears, choose 'Save Link As…', 'Save Target As…', 'Save Picture as...' or 'Download Link to Disk'.
-
Choose where you would like to save the image and then click 'Save'. Note: If prompted to save as either 'text' or 'source', choose 'source'.
-
Close the separate window to return to this gallery page.