|
|
 |
|
|
|
 |
|
|
|
Koeppel Community Sports Center |
 |
|
 |
 |
November
The foundation is finished and all inspections have been passed. Now the construction team will work to complete a system of underground supports. The CSC, with its wide-open hockey rink, cannot have pillars throughout the building, so these underground supports are a critical component of the structure.
(Click here for instructions for downloading these photos.)
 |
|
 |
Workers at the CSC site. |
|
A completed pier. These structures are part of the support upon which the CSC will rest. |
 |
|
 |
|
A sample cross section of the outer wall of the CSC. The construction company makes this sample to show to architects and inspectors before the actual walls are constructed. |
|
Site managers consult plans as work continues. |
Download instructions:
Larger versions (approx. 6"x10", 300 dpi) of the images above are available for download by the media.
-
Click a desired thumbnail above.
-
A separate window will open displaying a larger version of the photo you selected. Click-and-hold (Windows® users right-click) on the image in this separate window.
-
From the menu that appears, choose 'Save Link As…', 'Save Target As…', 'Save Picture as...' or 'Download Link to Disk'.
-
Choose where you would like to save the image and then click 'Save'. Note: If prompted to save as either 'text' or 'source', choose 'source'.
-
Close the separate window to return to this gallery page.
back to top
|
 |
|
 |
|