Things are looking up! After spending three months focused on the ground as they worked exclusively on the foundation, construction workers at the CSC site are getting a new perspective on things. In late December, the steel frame began to take shape. As of the first week in January, steel work for the south and east sides of the building was in place.
Work also continues to bring water and other utilities to the building. Once that is complete the concrete slabs for the floor will be laid.
(Click here for instructions for downloading these photos.)
 |
|
 |
|
The steel framing for the south and east sides of the CSC are in place. |
|
Summit Tower can be seen to the north through the girder work. In a few months, after the walls are in place, this view will be gone. |
 |
|
 |
|
Workers attach a girder between two uprights. This new girder will provide stability. In addition, the facing will be attached to these cross pieces. |
|
The steel frame silhouetted against the gray winter sky. |
Download instructions:
Larger versions (approx. 6"x10", 300 dpi) of the images above are available for download by the media.
-
Click a desired thumbnail above.
-
A separate window will open displaying a larger version of the photo you selected. Click-and-hold (Windows® users right-click) on the image in this separate window.
-
From the menu that appears, choose 'Save Link As…', 'Save Target As…', 'Save Picture as...' or 'Download Link to Disk'.
-
Choose where you would like to save the image and then click 'Save'. Note: If prompted to save as either 'text' or 'source', choose 'source'.
-
Close the separate window to return to this gallery page.
back to top
|
 |
|